Notice of postponement of closed construction
2024-10-30 11:10

Due to the need for rail replacement construction at the railway crossing at the intersection of Jinyao Line Railway and Dalian Bay North Street, in accordance with Article 39 of the "Road Traffic Safety Law of the People's Republic of China", from 0:00 on October 29, 2024 to October 2024 At 12:00 on the 29th, Dalian Bay North Street (Jinyao Line Railway Intersection) was fully closed for construction. Due to the temporary adjustment of railway capacity by Shenyang Railway Bureau, the construction originally scheduled from 0: 00 to 12: 00 on October 29th needs to be postponed to 0: 00 to 12: 00 on October 31st. During the construction period, small vehicles passing by Guandong Road and Wuming Road on the south side of the railway can be bypassed according to the instructions of on-site staff and traffic signs (the height limit of Wuming Road is 3.3 meters), and large vehicles (vehicle height is 3.3 meters and above) can be bypassed by Guandong Road, Jiabao Street, Zhenlian Road Bridge, Dalian Bay Street and other routes.

Please understand the inconvenience caused to you due to road construction.